Legislator Rechtsprechung & Gesetzgebung
P 686-24 KI-generiert

Building permit denied for three-story house in basement due to missing elevator requirement.

Geschäftsnummer P 686-24
Gericht / Behörde
Rechtsordnung Schweden (SE)
Entscheiddatum
Ausgang Abgewiesen (Dismissed)

Legislator-Zusammenfassung

KI-generiert

The Administrative Court of Sweden dismissed the building permit application for a three-story structure located in a basement. The authority determined that the ground floor constitutes a full story, necessitating an elevator or lift under zoning regulations. Consequently, the lack of a required lift led to the rejection of the permit.

Legislator-Regeste

KI-generiert

Bygglagen (2010:480); Boverkets allmänna råd: A building with three full stories situated in a basement requires an elevator or lift, and failure to provide one results in permit denial.

Schlagwörter

KI-generiert
building permit denial basement construction elevator requirement story classification zoning regulations administrative review multi-story housing Mehrfamilienhaus

Zitierte Gesetzesbestimmungen

KI-generiert
Bygglagen (2010:480)
KI-generiert

Fragen Sie sich, wie dieser Entscheid auf Ihren Fall anwendbar ist?

Prüfen Sie diesen Entscheid zusammen mit Bundesrecht, kantonalen Erlassen, Kommentaren und Folgeentscheiden in Legislator AI.

Fall in Legislator öffnen →

Volltext

Nybyggnation av flerbostadshus bestående av tre hela plan och ett loft, varav det nedersta planet ligger i suterräng. MÖD har bedömt att sluttningsvåningen utgör en våning. Byggnaden har därmed tre våningar. Det innebär i sin tur att ansökan om bygglov inte uppfyller kravet på hiss eller andra lyftanordningar. MÖD har avslagit ansökan om bygglov.