1. The law regulates the maintenance and use of waters, water construction, as well as buildings and facilities on and in the water.
2. The provisions of the law are applicable to public waters. For private waters, they apply to the extent explicitly provided or inferred from the purpose of the regulation.
**1. People, animals, and significant property values must be protected from harmful effects of water, in particular from floods, erosion, sedimentation, and debris flows (flood protection). Flood protection is ensured by the maintenance of water bodies, through spatial planning measures and, if these are insufficient, through hydraulic engineering measures.**
**2. Water bodies are, as far as possible, to be preserved in their natural state and designed to be close to nature. In particular, it is important to ensure that:**
a. existing habitats for animals and plants are preserved and new ones are created,
b. the natural course of the water body is maintained or restored as far as possible,
c. site-appropriate riparian vegetation is maintained and cared for or restored,
d. structural measures are designed in such a way that not only floods but also low water levels are taken into account.
**3. The canton and municipalities promote the enhancement of structurally impaired surface water bodies through renaturation.**
**4. The various protection and usage interests are to be assessed as a whole and coordinated with one another. In particular, it is about:**
a. using land economically,
b. preserving landscapes and townscapes,
c. maintaining existing nature-based recreational areas and creating new ones if possible,
d. facilitating public access to water bodies,
e. considering the interests of settlement development as well as agriculture and forestry,
f. maintaining the quality and quantity of drinking water.
**5. The measures for flood protection and renaturation are to be prioritized. Economic use of resources must be ensured.**
1. The canton, with the participation of the municipalities, develops the basis for the planning and coordination of flood protection measures and renaturation. Hazard maps are created by the municipalities, subject to special circumstances, according to the guidelines of the federal government and the canton.
2. These principles must be observed in all spatially effective activities and planning.
3. The government council sets out the objectives of flood protection for different categories of objects in the regulation.
1. As waters within the meaning of this law are considered all surface waters, whether permanently or periodically containing water, standing or flowing, located between the boundaries of the waters. Natural or artificial alterations, particularly covering or enclosing, do not affect the qualification as waters and their legal nature.
2. The boundary of the waters is considered to be
a. in the case of open flowing waters, the top edge of the bank or the back edge of the bank protection structure,
b. in the case of enclosed flowing waters, the outer boundary of the conduit construction,
c. in the case of standing waters, the shoreline.
3. If, in the case of section 2a, a top edge of the bank is located outside the designated water area, the boundary of the water area is considered the boundary of the waters. The government council may regulate further specific circumstances in the ordinance.
1. Waters are public and constitute common property designated for general use. The government council shall regulate the use and its restrictions, particularly navigation, in the ordinance.
2. Waters with proven private property rights are not public. Such private rights can be wholly or partially redeemed or restricted if an overriding public interest is demonstrated. The Expropriation Act shall apply accordingly.
3. The canton shall make information about the waters in the canton of Lucerne and their legal nature publicly available in an appropriate form. The municipalities are to be involved in the preparation of the foundations.
4. The Department of Construction, Environment, and Economic Affairs shall decide if there is a dispute about whether a body of water exists and whether it is public.
1. The competent authority fulfills the tasks incumbent on the canton as per this law, unless otherwise expressly regulated. It exercises the sovereign powers provided for in this law over public and private waters.
2. Unless the municipality has provided otherwise in its legislative enactments, the competent authority of the municipality is the municipal council.
3. The government council shall regulate further details in the ordinance.
1. The access roads and pathways required for the enforcement of this law must be tolerated.
1. Watercourse maintenance consists of the operational and structural maintenance of the watercourses. The purpose of watercourse maintenance is to ensure that the watercourses, structures, and facilities are maintained in such a way that they consistently fulfill their functions.
2. Operational watercourse maintenance includes
a. necessary clearing and cleaning operations,
b. the preservation and care of riparian vegetation,
c. the maintenance of paths that serve exclusively or predominantly for watercourse maintenance.
3. Structural watercourse maintenance includes the upkeep of structures and facilities constructed within the framework of hydraulic engineering. Structural watercourse maintenance also includes immediate measures that need to be executed as quickly as possible following flood events to preserve infrastructure.
4. To the extent that it is expedient for ensuring watercourse maintenance, the canton and municipalities acquire ownership of the areas between the watercourse boundaries according to § 4 and obtain the necessary real rights to structures and facilities constructed outside these areas within the framework of hydraulic engineering.
5. Measures for watercourse maintenance within a forest must be coordinated with forestry measures in accordance with federal and cantonal forest legislation.
6. The government council regulates the details in the ordinance.
1. Hydraulic Engineering Encompasses Construction Measures That Exceed Watercourse Maintenance, Specifically
a. the creation and replacement of structures and facilities for flood protection,
b. the renaturation of bodies of water,
c. the creation and relocation of bodies of water,
d. the creation and modification of pathways for watercourse maintenance.
2. The Government Council Regulates Further Details in the Ordinance.
1. The constructional maintenance of water bodies and the hydraulic engineering for public waters, subject to special legal relationships, are the responsibility of the canton.
2. The operational maintenance of water bodies is the responsibility of the canton for public flowing waters with a natural bed width of over 15 meters, subject to special legal relationships. For other public waters, the responsibility lies with the municipality. The government council identifies in the ordinance the sections of water bodies to be maintained by the canton.
3. The canton can delegate its tasks as follows
a. The government council may, on a case-by-case basis and upon request, delegate the planning and execution of hydraulic measures to a municipality or third parties at their expense. In exceptional cases, a complete or partial waiver of cost transfer is possible.
b. The government council or the competent service may, on a case-by-case basis and upon request, delegate the constructional maintenance of water bodies to a municipality or third parties at their expense. In exceptional cases, a complete or partial waiver of cost transfer is possible.
c. The government council or the competent service may delegate the operational maintenance of water bodies, where special legal relationships exist, with or without cost implications to third parties, either wholly or partially. Such third parties must be consulted in advance.
4. Municipalities may delegate their tasks wholly or partially to third parties with or without cost implications. Such third parties must be consulted in advance.
1. The Cantonal Council enacts a program of measures that specifies the actions to be planned, executed, or continued during the program period concerning public bodies of water.
2. The program of measures includes a brief description of the measures as well as their estimated costs. Smaller measures can be grouped into collective categories.
3. The affected municipalities and interested parties have the right to express their opinions.
4. The program of measures is to be revised at least every four years. Any changes or additions must be newly adopted.
5. Deviations from the program of measures due to unforeseeable events remain reserved.
1. The operational and structural maintenance of bodies of water and water engineering for private bodies of water are to be carried out by the interested parties at their own expense. Special legal relationships remain reserved.
2. Disputes are decided by the civil judge.
1. The competent authority shall organize the establishment and operation of early warning services in accordance with Article 24 of the Ordinance on Water Structures dated November 2, 1994, for all bodies of water.
1. In the event of flood danger and during an occurrence, the municipality is required to order the necessary emergency measures for all bodies of water, with costs for the bodies of water maintained operationally by the canton to be borne by the canton.
1. Property owners are required to tolerate water maintenance and construction measures, as well as measures to prevent dangers, on their properties. The competent Cantonal and municipal authorities are allowed to enter the property affected by the measure and the neighboring properties at any time in order to perform their functions.
2. As far as the planned measures allow, consideration should be given to the condition of vegetation and crops.
3. Except in urgent cases, the measures must be notified to the property owners at least 10 days prior to their execution and must not last longer than necessary.
4. If damage is caused by the measures, it must be compensated for. In case of a dispute, compensation shall be determined in an appraisal procedure in accordance with the Expropriation Act. Any damage claims must be submitted to the Appraisal Commission. Such claims expire one year after the damage becomes known, but no later than 5 years after the occurrence of the damage.
1. Hydraulic engineering measures pursuant to § 9 paragraph 1 require a project approval.
2. A building permit from the municipality is not required insofar as the structures and installations are components of the hydraulic engineering project.
3. If measures pursuant to § 9 paragraph 1 are planned and executed outside of the measures program by municipalities and third parties at their own expense, notwithstanding paragraph 1, approval from the competent authority is required. The approval procedure is governed by § 29 and applies mutatis mutandis to § 30.
1. The water construction project is to be made publicly known according to the guidelines set forth by the government council in the ordinance, and is to be publicly displayed along with the annexes. If the project approval procedure (main procedure according to § 192a of the Planning and Building Act) is to be coordinated with other procedures, the instructing authority shall ensure a joint public display of all relevant documents.
1bis. Before the public display, a draft of the land acquisition contract must be submitted early to the property owners affected by the land acquisition. The government council may provide for exceptions in the ordinance for the acquisition of minor areas or if the early submission of the draft would significantly delay further project planning due to special circumstances.
2. The project is to be publicly displayed for 20 days, unless federal law provides otherwise.
3. The neighbors according to § 193 paragraph 3 of the Planning and Building Act are to be informed of the public display of the project with reference to the opportunity to file objections during the display period. In the case of joint ownership, notification can be made to the administration.
1. Objections must be submitted in writing, along with a request and its justification, in duplicate, to the office specified in the public announcement, within the publication period.
1. The government council decides on the water construction project and the public law objections.
2. It issues
a. with its decision, all further necessary permits and orders from cantonal authorities related to the same matter,
b. the necessary, content-coordinated conditions and requirements.
3. With its decision, the government council grants the right of expropriation.
1. For the projects designated by the Government Council in the ordinance, which can be decided upon in a simplified project approval procedure, it applies, contrary to the provisions in §§ 17 ff., that
a. the project does not need to be staked out or marked,
b. the project does not need to be publicly announced or publicly displayed,
c. the project must be notified to the affected property owners who have not consented to the project by signature, with the indication that they can raise objections within 10 days,
d. the Government Council or the Department of Construction, Environment, and Economic Affairs decides on the project and the objections.
1. To ensure water management, the Executive Council may designate a planning zone for precisely defined areas. This becomes effective upon its public announcement.
2. Within the area covered by the planning zone, no actions may be taken that contradict or could impair its future use for hydraulic engineering.
3. The area affected by a water construction project is considered a planning zone from the time of its public announcement.
4. The provisions in §§ 83 and 84 of the Planning and Construction Act regarding the duration of validity of the planning zone and the procedure shall apply mutatis mutandis.
1. Measures pursuant to § 9 paragraph 1 regarding private waters require approval from the competent authority.
2. § 29 applies to the approval procedure.
1. The Canton and municipalities bear the respective costs of the tasks incumbent upon them. Special legal relationships remain reserved.
2. The municipality can transfer the costs of operational water maintenance to interested parties in whole or in part according to §§ 109-112 of the Planning and Construction Act through the perimeter procedure. Owners of artificial water conduits can also be included in the obligation to contribute.
3. If municipalities and third parties request the execution of a project that exceeds the required standard, they must pay the additional costs.
4. Furthermore, municipalities and third parties make an appropriate contribution to water construction measures if this eliminates or reduces the cost of measures to which they are obligated. The amount of the contribution is determined by the benefits and advantages they gain from the measures. In case of dispute, the government council determines the contribution.
1. The canton uses the following resources for its assigned tasks
a. Contributions from the federal government,
b. Contributions from municipalities and third parties in accordance with this law,
c. Prevention contributions from the Luzern building insurance,
d. Other resources provided for this purpose.
1. Structures and facilities must maintain the distance determined by the designated watercourse area from the body of water. For its determination in land-use planning, the federal and cantonal regulations concerning the protection of bodies of water apply.
2. If the designation of a watercourse area is waived, structures and facilities must maintain a minimum distance of 3 meters from the watercourse boundary.
3. For important reasons, the competent authority may prescribe greater distances on a case-by-case basis.
1. Within the distances specified in § 25, the competent authority may grant exemptions for new buildings and facilities, provided that the conditions set forth in federal law for structures and facilities within the water area are met.
2. For new buildings and facilities within the distances specified in § 25 paragraph 2, the competent authority may also grant exemptions if
a. these are required at the planned location for technical, operational, or economic reasons, or are not feasible at another location,
b. they are in compliance with zoning regulations, and
c. there are no overriding interests opposing them.
3. Floodwater runoff, watercourse maintenance, planned hydraulic engineering measures, and access to the water must be ensured.
1. Exceptions for Existing Buildings and Facilities Within the Distances According to § 25 are approved by the competent authority. The provisions of §§ 178 et seq. of the Planning and Construction Act apply.
1. Anyone who wishes to construct or alter a building or facility in or its use in a public body of water must obtain a permit for this purpose. Structures and facilities in bodies of water also include those directly above or below the water.
2. The governing council specifies in the ordinance which structures and facilities require a permit. It also regulates the cases in which a building permit from the municipality is not required in addition.
1. Insofar as no project approval procedure pursuant to this law or the Road Act is to be conducted, and no construction permit is required, the provisions of §§ 191-198 of the Planning and Building Act shall apply mutatis mutandis to the approval procedure. In this context, this approval procedure shall be considered the main procedure.
1. The competent authority may grant the permit under the conditions established in federal law for constructions and installations in the water body area.
2. For constructions and installations in a public water body, but not in the water body area, the competent authority may also grant the permit if
a. these are required at the planned location for technical, operational, or economic reasons, or are not suitable at another location,
b. they comply with the zoning regulations or are used for industrial and commercial activities that can only be carried out in connection with the water body, and
c. there are no overriding interests against them.
3. The flood discharge, water body maintenance, planned hydraulic engineering measures, and access to the water body must be ensured.
4. The owners of the affected shore properties must have consented to the project.
5. The permit may be subject to conditions and requirements, in particular, it may be limited in time or declared revocable. Applicants may be required to provide advances and appropriate securities to ensure the fulfillment of important conditions and requirements prior to the issuance of the permit.
1. Authorized structures and facilities are owned by the authorization holders and must be properly maintained by them. Debris in the area of the structures and facilities must be continuously removed.
2. The authorization holders bear all additional costs arising due to their structures and facilities. They must relocate, modify, or adjust the authorized structures and facilities at their own expense if deemed necessary as a result of water management or maintenance of water bodies.
3. The authorization holders are liable under civil law for any damage arising from the construction, existence, or use of the structures or facilities. They must promptly remedy the damage and, as far as possible, the causes thereof.
1. The transfer of a permit to third parties requires the approval of the competent authority. Such approval may only be refused if overriding public interests oppose the transfer or if the fulfillment of the obligations associated with the permit can no longer be guaranteed.
1. Permits may be renewed. The application must be submitted in a timely manner. § 30 applies.
1. The permit expires at the end of its term, through explicit renouncement, or by revocation.
2. The competent authority may revoke the permit if the permit holder
a. fails to fulfill essential conditions and requirements of the permit,
b. does not use the permit for two years or interrupts its use and does not resume its use within a reasonable period,
c. violates important obligations, in particular by significantly neglecting maintenance or failing to pay fees.
3. Permit holders are obligated, after the permit expires, to remove constructions and installations at their own expense and to carry out the security and restoration work ordered by the competent authority after consulting the municipality.
1. Buildings and facilities lawfully constructed before January 1, 1993, whose permits cannot be renewed, shall be tolerated for the time being. They may only be maintained, and facilities may be renovated beyond standard maintenance. The competent authority shall order their removal if significant concerns of spatial planning, water protection, or other overriding public interests require it.
1. For constructions and facilities in public waters, the competent authority shall levy a fee from the holders of the permit or the parties entitled to the constructions and facilities.
2. The fees are to be used for flood protection measures and renaturation.
3. The assessment of the fee shall be based in particular on the following criteria
a. Benefits and advantages for those subject to the fee,
b. Location of the construction or facility,
c. Disadvantages for the body of water.
4. The fee amounts annually to
a. For constructions, fixed facilities, pipelines, as well as for the anchoring of watercraft, 2 to 20 Swiss francs per square meter of the occupied area, but at least 150 Swiss francs,
b. For facilities for the discharge of wastewater, except for the discharge of stormwater, 150 to 3000 Swiss francs.
5. Furthermore, the amount of the fees and their collection, as well as exemptions from the obligation to pay fees, are determined by the government council in the ordinance.
6. If the use of a public body of water primarily serves public interests, the fees may be wholly or partially waived.
1. Whoever intends to construct or modify a structure or facility in its construction or usage within a private water body must obtain a permit from the competent authority if such a requirement is stipulated in a cantonal protection ordinance or another cantonal decree. Structures and facilities in water bodies also include those directly above or below the water bodies.
1. Appeals against municipal decisions regarding cost allocation in accordance with § 23 paragraph 2 may be lodged by means of an objection in accordance with the Administrative Procedure Act, and appeals against objection decisions can be filed as administrative court complaints.
2. Furthermore, all decisions and resolutions issued in application of this law can be contested within 20 days, and interim decisions within 10 days, by filing an administrative court complaint with the Cantonal Court, unless this law stipulates otherwise.
1. Entitlement to Object and Appeal Under This Act
a. Persons having a legitimate interest in the rejection of an application or in the modification or revocation of a challenged decision, resolution, or draft,
b. Cantonal authorities may object to applications and drafts, as well as to decisions and resolutions of municipalities, provided that the application, draft, decision, or resolution concerns a subject area that, according to organizational law provisions, falls within the scope of cantonal administration,
c. Organizations entitled to lodge complaints under federal law in the field of environmental, nature, and heritage protection, as well as their sections active in the Canton of Lucerne in the cases provided for therein,
d. Other organizations in the field of environmental, nature, and heritage protection, which have been dedicated to environmental, nature, or heritage protection in the Canton of Lucerne according to their statutes for five years, within the framework of their statutory purpose, insofar as the interests of environmental, nature, or heritage protection are concerned,
e. Other persons, authorities, and organizations authorized by the legal order.
2. Prior to the issuance of a decision or resolution made in application of this Act, if an objection procedure is conducted, only those may appeal who
a. participated as a party in the objection procedure, or
b. are subsequently affected in their legitimate interests by the decision or resolution.
1. The Department of Construction, Environment, and Economic Affairs exercises oversight and is particularly responsible for ensuring that the waters are properly maintained and the necessary hydraulic engineering measures are carried out.
2. The Department of Justice and Security exercises oversight over navigation.
1. Anyone who acts contrary to an order issued based on this law or fails to fulfill a condition or provision must remedy the unlawful situation at their own expense.
2. The competent department is responsible for restoring the lawful situation in accordance with the provisions of the Administrative Procedure Act.
1. For the enforcement of this Act and the provisions enacted based thereon, the competent authority may register its measures, stipulations, and conditions as a public-law property restriction in the land register at the expense of the landowner.
2. The authority shall revoke the public-law property restrictions and have them deleted from the land register when the prerequisites are no longer applicable.
1. For the fees pursuant to § 36 and for the costs of the proceedings and measures for restoring the lawful condition pursuant to § 41, a statutory lien exists on the relevant properties, taking precedence over other liens, for a duration of two years from the due date. Subject to Article 836 paragraph 2 of the Swiss Civil Code, no entry in the land register is required.
1. Intentional or negligent violations of §§ 7, 15 paragraph 1, 16 paragraph 3, 21 paragraph 2, 22 paragraph 1, 25 paragraphs 1 and 2, and 28 paragraph 1, as well as violations of regulations and decisions issued based on this law that provide for a penalty, are punishable by a fine of up to 20,000 Swiss Francs, and in severe cases or in the event of repeat offenses, up to 40,000 Swiss Francs.
2. If the act is associated with a financial benefit, this serves as an aggravating factor. If the perpetrator or the perpetrator acts out of greed for profit, the amount of the fine must at least equal the advantage gained.
3. Incitement and complicity are punishable.
4. The penal provisions of the Confederation are reserved. In cases of violations against federal or cantonal regulations concerning the use of waters, particularly through navigation, where the procedure for administrative fines is applied, the Lucerne police impose administrative fines.
1. Cost apportionments that were legally binding before this Act came into force shall be decisive for the bearing of costs, even if a measure is only implemented after the entry into force of this Act.
1. As long as the waterbody area has not yet been established in the land use plan, the competent authority is responsible for granting permits in accordance with Article 41c paragraphs 1 and 2 of the Swiss Water Protection Ordinance of October 28, 1998.
1. Acquired Rights According to § 73 of the Water Construction Act of January 30, 1979, Regarding Structures and Installations in Public Waters Are Valid Until 2035.
2. In Other Respects, §§ 33 and 35 Apply.
1. The fees pursuant to § 36 shall also be collected for the buildings and installations existing in public waters before the entry into force of this law.
1. Existing cooperative associations as per § 31 of the Water Construction Act of January 30, 1979, along water bodies that the canton is operationally responsible for maintaining, shall be dissolved and liquidated upon the enactment of this law. Any potential distribution of assets requires prior approval by the municipality.
2. Existing cooperative associations as per § 31 of the Water Construction Act of January 30, 1979, along other water bodies shall be dissolved and liquidated five years after the enactment of this law, unless the municipality has transferred the operational maintenance of the water bodies to them within this period. The cooperative statutes must be adapted to the new legal conditions. Any potential distribution of assets in the course of liquidation requires prior approval by the municipality.
3. The municipality shall initiate the deletion of any existing land register entries.