Legislator Jurisprudence & Législation
P 686-24 Généré par l'IA

Building permit denied for three-story house in basement due to missing elevator requirement.

Numéro de cause P 686-24
Autorité / Tribunal
Juridiction Suède (SE)
Date de la décision
Issue du litige Rejeté (Dismissed)

Synthèse Legislator

Généré par l'IA

The Administrative Court of Sweden dismissed the building permit application for a three-story structure located in a basement. The authority determined that the ground floor constitutes a full story, necessitating an elevator or lift under zoning regulations. Consequently, the lack of a required lift led to the rejection of the permit.

Regeste Legislator

Généré par l'IA

Bygglagen (2010:480); Boverkets allmänna råd: A building with three full stories situated in a basement requires an elevator or lift, and failure to provide one results in permit denial.

Mots-clés

Généré par l'IA
building permit denial basement construction elevator requirement story classification zoning regulations administrative review multi-story housing logement collectif

Dispositions légales citées

Généré par l'IA
Bygglagen (2010:480)
Généré par l'IA

Vous souhaitez savoir comment cet arrêt s'applique à votre dossier ?

Analysez cette décision avec la législation fédérale, le droit cantonal, la doctrine et la jurisprudence subséquente dans Legislator AI.

Ouvrir dans Legislator →

Texte complet

Nybyggnation av flerbostadshus bestående av tre hela plan och ett loft, varav det nedersta planet ligger i suterräng. MÖD har bedömt att sluttningsvåningen utgör en våning. Byggnaden har därmed tre våningar. Det innebär i sin tur att ansökan om bygglov inte uppfyller kravet på hiss eller andra lyftanordningar. MÖD har avslagit ansökan om bygglov.