Connection line to main grid exempted from network concession despite crossing road and running outside fence.
Sintesi Legislator
Generato dall'IAThe Administrative Court of Sweden allowed the exemption from network concession requirements for a short water power station connection line. The applicant argued the line, running 90 meters outside the fenced area and crossing road E45, did not affect existing or future concession holders' networks. The court agreed, noting the road was an integral part of the reservoir and power plant infrastructure.
Regesto Legislator
Generato dall'IA22 a § IKN-förordningen (2007:215); A connection line to the main grid is exempt from network concession requirements if it does not affect existing or future concession holders' networks and is part of the power plant's integrated infrastructure.
Parole chiave
Generato dall'IADisposizioni normative citate
Generato dall'IADecisioni correlate
Generato dall'IATesto completo
MÖD har funnit att en anslutningsledning från en vattenkraftsstation till stamnätet kan undantas från kravet på nätkoncession enligt 22 a § IKN-förordningen (2007:215), trots att ledningen i ca 90 meter ska dras utanför inhägnat område och korsa väg E45. Detta eftersom den korta ledningen varken påverkar befintliga eller kommande koncessionshavares elnät och vägen anlagts som en integrerad del av dammen och kraftverksanläggningen.